ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal cans
3+ Characters Required for Products

95

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,145k 197k
MMBtu
$6.39
- Electrical $631k 13,063k
kWh
$0.053
- Natural Gas $312k 63k
MMBtu
$6.19

765

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $100k 12k
MMBtu
6.3%
- Electrical $62k 1,215k
kWh
9.3%
- Natural Gas $18k -
MMBtu
-
Waste $1.7k
Productivity/Other $25k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall

86

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,106k 194k
MMBtu
$6.22
- Electrical $602k 12,802k
kWh
$0.051
- Natural Gas $308k 62k
MMBtu
$5.72

377

Implemented Recommendations

4.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 5.7k
MMBtu
3.0%
- Electrical $30k 558k
kWh
4.4%
- Natural Gas $3.7k -
MMBtu
-
Waste $0.4k
Productivity/Other $4.2k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall