ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal cans and shipping containers
3+ Characters Required for Products

130

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $998k 172k
MMBtu
$6.44
- Electrical $537k 10,866k
kWh
$0.057
- Natural Gas $292k 61k
MMBtu
$5.93

1,024

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 10k
MMBtu
5.9%
- Electrical $52k 998k
kWh
9.2%
- Natural Gas $18k -
MMBtu
-
Waste $5.2k
Productivity/Other $29k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

125

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,002k 173k
MMBtu
$6.41
- Electrical $539k 10,971k
kWh
$0.057
- Natural Gas $295k 61k
MMBtu
$5.91

526

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 4.9k
MMBtu
2.8%
- Electrical $26k 476k
kWh
4.3%
- Natural Gas $3.9k -
MMBtu
-
Waste $3.3k
Productivity/Other $12k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall