ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal cans and shipping containers
3+ Characters Required for Products

128

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $996k 172k
MMBtu
$6.43
- Electrical $540k 10,902k
kWh
$0.057
- Natural Gas $292k 60k
MMBtu
$5.95

1,009

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 10k
MMBtu
6.0%
- Electrical $53k 1,009k
kWh
9.3%
- Natural Gas $18k -
MMBtu
-
Waste $5.3k
Productivity/Other $30k
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

119

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $958k 168k
MMBtu
$6.31
- Electrical $516k 10,580k
kWh
$0.057
- Natural Gas $288k 59k
MMBtu
$5.85

507

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 4.9k
MMBtu
2.9%
- Electrical $26k 481k
kWh
4.6%
- Natural Gas $4.1k -
MMBtu
-
Waste $3.5k
Productivity/Other $12k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall