ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3399 Primary metal products, not elsewhere classified

62

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $539k 83k
MMBtu
$8.62
- Electrical $304k 5,163k
kWh
$0.070
- Natural Gas $152k 28k
MMBtu
$6.62

447

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 6.1k
MMBtu
7.4%
- Electrical $38k 595k
kWh
11.5%
- Natural Gas $15k -
MMBtu
-
Waste $27k
Productivity/Other $24k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

61

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $546k 84k
MMBtu
$8.47
- Electrical $308k 5,238k
kWh
$0.069
- Natural Gas $154k 28k
MMBtu
$6.72

178

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.7k
MMBtu
2.0%
- Electrical $11k 165k
kWh
3.1%
- Natural Gas $4.7k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.7k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall