ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary metal products, not elsewhere classified
3+ Characters Required for Products

64

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $527k 81k
MMBtu
$8.59
- Electrical $297k 5,057k
kWh
$0.070
- Natural Gas $148k 27k
MMBtu
$6.52

463

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 6.1k
MMBtu
7.6%
- Electrical $37k 598k
kWh
11.8%
- Natural Gas $15k -
MMBtu
-
Waste $26k
Productivity/Other $24k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall

62

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $539k 83k
MMBtu
$8.62
- Electrical $304k 5,163k
kWh
$0.070
- Natural Gas $152k 28k
MMBtu
$6.62

180

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $20k 1.8k
MMBtu
2.2%
- Electrical $12k 173k
kWh
3.4%
- Natural Gas $4.6k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.7k
TOTAL $23k
*May be negative reflecting an increased cost component required to save energy and costs overall