ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal heat treating
3+ Characters Required for Products

88

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $597k 111k
MMBtu
$7.79
- Electrical $220k 3,409k
kWh
$0.080
- Natural Gas $292k 75k
MMBtu
$6.60

618

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 3.9k
MMBtu
3.5%
- Electrical $28k 382k
kWh
11.2%
- Natural Gas $30k -
MMBtu
-
Waste $8.9k
Productivity/Other $18k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall

82

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $590k 115k
MMBtu
$7.05
- Electrical $212k 3,470k
kWh
$0.075
- Natural Gas $299k 79k
MMBtu
$6.14

278

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 1.6k
MMBtu
1.4%
- Electrical $9.8k 158k
kWh
4.6%
- Natural Gas $7.9k -
MMBtu
-
Waste $4.0k
Productivity/Other $6.5k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall