ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal heat treating
3+ Characters Required for Products

90

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $598k 110k
MMBtu
$7.86
- Electrical $218k 3,365k
kWh
$0.081
- Natural Gas $292k 75k
MMBtu
$6.63

633

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 3.9k
MMBtu
3.5%
- Electrical $28k 379k
kWh
11.3%
- Natural Gas $29k -
MMBtu
-
Waste $8.7k
Productivity/Other $18k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

87

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $597k 111k
MMBtu
$7.81
- Electrical $221k 3,437k
kWh
$0.079
- Natural Gas $292k 76k
MMBtu
$6.54

289

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 1.5k
MMBtu
1.4%
- Electrical $9.3k 150k
kWh
4.4%
- Natural Gas $7.4k -
MMBtu
-
Waste $3.8k
Productivity/Other $6.1k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall