ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Metal heat treating
3+ Characters Required for Products

85

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $591k 113k
MMBtu
$7.36
- Electrical $213k 3,451k
kWh
$0.076
- Natural Gas $297k 78k
MMBtu
$6.45

587

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 4.0k
MMBtu
3.5%
- Electrical $27k 386k
kWh
11.2%
- Natural Gas $29k -
MMBtu
-
Waste $9.2k
Productivity/Other $17k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall

81

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $596k 116k
MMBtu
$6.82
- Electrical $214k 3,508k
kWh
$0.073
- Natural Gas $303k 80k
MMBtu
$5.87

274

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 1.6k
MMBtu
1.4%
- Electrical $9.8k 159k
kWh
4.5%
- Natural Gas $8.0k -
MMBtu
-
Waste $4.1k
Productivity/Other $6.5k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall