ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous primary metal products
3+ Characters Required for Products

156

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $562k 97k
MMBtu
$8.16
- Electrical $248k 4,023k
kWh
$0.076
- Natural Gas $229k 54k
MMBtu
$6.59

1,109

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $69k 4.8k
MMBtu
4.9%
- Electrical $32k 464k
kWh
11.5%
- Natural Gas $23k -
MMBtu
-
Waste $16k
Productivity/Other $20k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

151

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $561k 98k
MMBtu
$7.99
- Electrical $249k 4,100k
kWh
$0.074
- Natural Gas $230k 55k
MMBtu
$6.49

476

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 1.6k
MMBtu
1.7%
- Electrical $10k 158k
kWh
3.9%
- Natural Gas $6.3k -
MMBtu
-
Waste $2.2k
Productivity/Other $4.6k
TOTAL $31k
*May be negative reflecting an increased cost component required to save energy and costs overall