ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum foundries
3+ Characters Required for Products

87

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $867k 154k
MMBtu
$6.79
- Electrical $336k 7,521k
kWh
$0.25
- Natural Gas $323k 74k
MMBtu
$5.33

673

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 6.4k
MMBtu
4.2%
- Electrical $31k 625k
kWh
8.3%
- Natural Gas $43k -
MMBtu
-
Waste $7.4k
Productivity/Other $49k
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $859k 154k
MMBtu
$6.76
- Electrical $329k 7,547k
kWh
$0.26
- Natural Gas $324k 74k
MMBtu
$5.37

271

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 3.3k
MMBtu
2.2%
- Electrical $14k 323k
kWh
4.3%
- Natural Gas $8.5k -
MMBtu
-
Waste $4.3k
Productivity/Other $10.0k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall