The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Aluminum die-castings | |
3+ Characters Required for Products |
144
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $917k | 159k |
MMBtu
|
$6.29 |
- Electrical | $401k | 8,592k |
kWh
|
$0.054 |
- Natural Gas | $372k | 70k |
MMBtu
|
$5.23 |
1,106
Recommendations
7.7
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $100k | 7.3k |
MMBtu
|
4.6% |
- Electrical | $34k | 715k |
kWh
|
8.3% |
- Natural Gas | $57k | - |
MMBtu
|
- |
Waste | $48k | |||
Productivity/Other | $67k | |||
TOTAL | $216k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
143
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $922k | 160k |
MMBtu
|
$6.26 |
- Electrical | $404k | 8,645k |
kWh
|
$0.054 |
- Natural Gas | $375k | 70k |
MMBtu
|
$5.20 |
503
Implemented Recommendations
3.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $33k | 2.4k |
MMBtu
|
1.5% |
- Electrical | $11k | 234k |
kWh
|
2.7% |
- Natural Gas | $19k | - |
MMBtu
|
- |
Waste | $3.4k | |||
Productivity/Other | $14k | |||
TOTAL | $51k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |