ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum die-castings
3+ Characters Required for Products

144

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $917k 159k
MMBtu
$6.29
- Electrical $401k 8,592k
kWh
$0.054
- Natural Gas $372k 70k
MMBtu
$5.23

1,106

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $100k 7.3k
MMBtu
4.6%
- Electrical $34k 715k
kWh
8.3%
- Natural Gas $57k -
MMBtu
-
Waste $48k
Productivity/Other $67k
TOTAL $216k
*May be negative reflecting an increased cost component required to save energy and costs overall

143

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $922k 160k
MMBtu
$6.26
- Electrical $404k 8,645k
kWh
$0.054
- Natural Gas $375k 70k
MMBtu
$5.20

503

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.4k
MMBtu
1.5%
- Electrical $11k 234k
kWh
2.7%
- Natural Gas $19k -
MMBtu
-
Waste $3.4k
Productivity/Other $14k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall