ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonferrous foundries (castings)
3+ Characters Required for Products

308

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $845k 146k
MMBtu
$6.64
- Electrical $368k 7,921k
kWh
$0.11
- Natural Gas $322k 63k
MMBtu
$5.43

2,412

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 6.6k
MMBtu
4.5%
- Electrical $33k 647k
kWh
8.2%
- Natural Gas $44k -
MMBtu
-
Waste $28k
Productivity/Other $69k
TOTAL $186k
*May be negative reflecting an increased cost component required to save energy and costs overall

300

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $836k 146k
MMBtu
$6.56
- Electrical $362k 7,941k
kWh
$0.11
- Natural Gas $321k 63k
MMBtu
$5.42

1,079

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.8k
MMBtu
1.9%
- Electrical $13k 271k
kWh
3.4%
- Natural Gas $15k -
MMBtu
-
Waste $3.0k
Productivity/Other $14k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall