ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drawing and insulating of nonferrous wire
3+ Characters Required for Products

80

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $714k 123k
MMBtu
$7.38
- Electrical $451k 9,454k
kWh
$0.061
- Natural Gas $139k 25k
MMBtu
$5.42

639

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 9.8k
MMBtu
7.9%
- Electrical $61k 953k
kWh
10.1%
- Natural Gas $23k -
MMBtu
-
Waste $5.8k
Productivity/Other $34k
TOTAL $144k
*May be negative reflecting an increased cost component required to save energy and costs overall

80

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $714k 123k
MMBtu
$7.38
- Electrical $451k 9,454k
kWh
$0.061
- Natural Gas $139k 25k
MMBtu
$5.42

250

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.9k
MMBtu
2.3%
- Electrical $18k 281k
kWh
3.0%
- Natural Gas $6.0k -
MMBtu
-
Waste $3.1k
Productivity/Other $8.6k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall