ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3354 Aluminum extruded products

92

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,311k 225k
MMBtu
$6.43
- Electrical $590k 11,478k
kWh
$0.057
- Natural Gas $527k 103k
MMBtu
$4.90

768

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $179k 15k
MMBtu
6.7%
- Electrical $91k 1,462k
kWh
12.7%
- Natural Gas $62k -
MMBtu
-
Waste $14k
Productivity/Other $123k
TOTAL $316k
*May be negative reflecting an increased cost component required to save energy and costs overall

91

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,261k 218k
MMBtu
$6.42
- Electrical $560k 11,133k
kWh
$0.057
- Natural Gas $518k 100k
MMBtu
$4.91

318

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.2k
MMBtu
1.9%
- Electrical $20k 410k
kWh
3.7%
- Natural Gas $15k -
MMBtu
-
Waste $5.8k
Productivity/Other $19k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall