ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Aluminum extruded products
3+ Characters Required for Products

93

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,303k 223k
MMBtu
$6.64
- Electrical $588k 11,378k
kWh
$0.059
- Natural Gas $522k 102k
MMBtu
$4.84

774

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $178k 15k
MMBtu
6.7%
- Electrical $90k 1,448k
kWh
12.7%
- Natural Gas $61k -
MMBtu
-
Waste $14k
Productivity/Other $122k
TOTAL $314k
*May be negative reflecting an increased cost component required to save energy and costs overall

92

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,311k 225k
MMBtu
$6.43
- Electrical $590k 11,478k
kWh
$0.057
- Natural Gas $527k 103k
MMBtu
$4.90

321

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 4.3k
MMBtu
1.9%
- Electrical $21k 419k
kWh
3.6%
- Natural Gas $15k -
MMBtu
-
Waste $5.7k
Productivity/Other $19k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall