ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary smelting and refining of nonferrous
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,939k 764k
MMBtu
$6.83
- Electrical $1,515k 37,152k
kWh
$0.058
- Natural Gas $1,976k 383k
MMBtu
$6.19

270

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $192k 19k
MMBtu
2.5%
- Electrical $85k 1,856k
kWh
5.0%
- Natural Gas $85k -
MMBtu
-
Waste $4.6k
Productivity/Other $43k
TOTAL $240k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,003k 782k
MMBtu
$6.59
- Electrical $1,536k 37,987k
kWh
$0.057
- Natural Gas $2,014k 392k
MMBtu
$5.87

123

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
0.5%
- Electrical $20k 403k
kWh
1.1%
- Natural Gas $13k -
MMBtu
-
Waste $1.4k
Productivity/Other $17k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall