ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary smelting and refining of nonferrous
3+ Characters Required for Products

35

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,025k 779k
MMBtu
$6.68
- Electrical $1,562k 38,555k
kWh
$0.057
- Natural Gas $2,009k 384k
MMBtu
$5.95

260

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $202k 20k
MMBtu
2.6%
- Electrical $89k 1,948k
kWh
5.1%
- Natural Gas $90k -
MMBtu
-
Waste $4.9k
Productivity/Other $40k
TOTAL $247k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,068k 794k
MMBtu
$6.72
- Electrical $1,574k 39,681k
kWh
$0.057
- Natural Gas $2,021k 388k
MMBtu
$5.98

117

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.1k
MMBtu
0.5%
- Electrical $20k 400k
kWh
1.0%
- Natural Gas $13k -
MMBtu
-
Waste $1.5k
Productivity/Other $19k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall