ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel investment foundries
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $669k 313k
MMBtu
$7.78
- Electrical $376k 5,618k
kWh
$0.070
- Natural Gas $181k 252k
MMBtu
$5.82

290

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 4.5k
MMBtu
1.4%
- Electrical $32k 439k
kWh
7.8%
- Natural Gas $29k -
MMBtu
-
Waste $4.8k
Productivity/Other $119k
TOTAL $197k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $673k 342k
MMBtu
$7.53
- Electrical $392k 5,831k
kWh
$0.070
- Natural Gas $177k 279k
MMBtu
$5.54

134

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 2.1k
MMBtu
0.6%
- Electrical $14k 203k
kWh
3.5%
- Natural Gas $3.0k -
MMBtu
-
Waste $2.9k
Productivity/Other $53k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall