ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Malleable iron foundries
3+ Characters Required for Products

14

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,488k 237k
MMBtu
$7.87
- Electrical $765k 14,850k
kWh
$0.055
- Natural Gas $315k 60k
MMBtu
$4.34

88

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $194k 11k
MMBtu
4.8%
- Electrical $126k 1,103k
kWh
7.4%
- Natural Gas ($-16.2)k -
MMBtu
-
Waste $3.4k
Productivity/Other $36k
TOTAL $233k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,506k 259k
MMBtu
$6.88
- Electrical $769k 15,986k
kWh
$0.051
- Natural Gas $365k 70k
MMBtu
$4.78

37

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $117k 8.7k
MMBtu
3.4%
- Electrical $110k 848k
kWh
5.3%
- Natural Gas ($-4.2)k -
MMBtu
-
Waste $1.1k
Productivity/Other $17k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall