ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gray and ductile iron foundries
3+ Characters Required for Products

153

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,629k 263k
MMBtu
$7.10
- Electrical $845k 18,525k
kWh
$0.15
- Natural Gas $284k 53k
MMBtu
$5.79

1,106

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $133k 12k
MMBtu
4.6%
- Electrical $70k 1,187k
kWh
6.4%
- Natural Gas $23k -
MMBtu
-
Waste $11k
Productivity/Other $52k
TOTAL $196k
*May be negative reflecting an increased cost component required to save energy and costs overall

150

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,656k 267k
MMBtu
$6.95
- Electrical $858k 18,844k
kWh
$0.15
- Natural Gas $289k 53k
MMBtu
$5.70

475

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.4k
MMBtu
1.7%
- Electrical $21k 430k
kWh
2.3%
- Natural Gas $8.2k -
MMBtu
-
Waste $3.3k
Productivity/Other $16k
TOTAL $62k
*May be negative reflecting an increased cost component required to save energy and costs overall