ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel pipe and tubes
3+ Characters Required for Products

77

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $849k 142k
MMBtu
$7.12
- Electrical $457k 9,561k
kWh
$0.060
- Natural Gas $198k 44k
MMBtu
$4.75

568

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 11k
MMBtu
7.7%
- Electrical $60k 1,074k
kWh
11.2%
- Natural Gas $17k -
MMBtu
-
Waste $8.4k
Productivity/Other $51k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

76

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $853k 144k
MMBtu
$7.06
- Electrical $457k 9,630k
kWh
$0.060
- Natural Gas $201k 45k
MMBtu
$4.81

286

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $44k 5.3k
MMBtu
3.7%
- Electrical $25k 513k
kWh
5.3%
- Natural Gas $7.2k -
MMBtu
-
Waste $3.8k
Productivity/Other $9.6k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall