ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cold-rolled steel sheet, strip, and bars
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $677k 118k
MMBtu
$7.78
- Electrical $370k 6,653k
kWh
$0.066
- Natural Gas $177k 39k
MMBtu
$5.73

274

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 6.3k
MMBtu
5.4%
- Electrical $34k 616k
kWh
9.3%
- Natural Gas $11k -
MMBtu
-
Waste $16k
Productivity/Other $60k
TOTAL $151k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $704k 123k
MMBtu
$7.66
- Electrical $385k 6,932k
kWh
$0.066
- Natural Gas $185k 41k
MMBtu
$5.35

109

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 1.7k
MMBtu
1.4%
- Electrical $11k 163k
kWh
2.3%
- Natural Gas $3.4k -
MMBtu
-
Waste $8.3k
Productivity/Other $1.4k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall