ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cold-rolled steel sheet, strip, and bars
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $764k 145k
MMBtu
$7.82
- Electrical $426k 7,768k
kWh
$0.066
- Natural Gas $208k 56k
MMBtu
$14.91

292

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 7.7k
MMBtu
5.3%
- Electrical $43k 751k
kWh
9.7%
- Natural Gas $10k -
MMBtu
-
Waste $15k
Productivity/Other $56k
TOTAL $155k
*May be negative reflecting an increased cost component required to save energy and costs overall

38

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $785k 151k
MMBtu
$7.67
- Electrical $433k 8,019k
kWh
$0.065
- Natural Gas $217k 58k
MMBtu
$5.64

122

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 1.7k
MMBtu
1.1%
- Electrical $11k 161k
kWh
2.0%
- Natural Gas $3.3k -
MMBtu
-
Waste $7.6k
Productivity/Other $1.5k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall