ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Steel works, blast furnaces, and rolling and finishing mills
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,899k 324k
MMBtu
$6.83
- Electrical $483k 12,664k
kWh
$0.053
- Natural Gas $1,117k 194k
MMBtu
$7.21

37

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $191k 15k
MMBtu
4.5%
- Electrical $50k 1,432k
kWh
11.3%
- Natural Gas $113k -
MMBtu
-
Waste $8.8k
Productivity/Other $3.1k
TOTAL $202k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,899k 324k
MMBtu
$6.83
- Electrical $483k 12,664k
kWh
$0.053
- Natural Gas $1,117k 194k
MMBtu
$7.21

14

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 10k
MMBtu
3.2%
- Electrical $36k 1,009k
kWh
8.0%
- Natural Gas $13k -
MMBtu
-
Waste $8.8k
Productivity/Other -
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall