ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary metal industries
3+ Characters Required for Products

1,381

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,257k 228k
MMBtu
$7.03
- Electrical $615k 13,287k
kWh
$0.083
- Natural Gas $409k 87k
MMBtu
$5.84

10,614

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $114k 9.4k
MMBtu
4.1%
- Electrical $52k 914k
kWh
6.9%
- Natural Gas $41k -
MMBtu
-
Waste $16k
Productivity/Other $74k
TOTAL $204k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,342

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,265k 230k
MMBtu
$6.89
- Electrical $618k 13,481k
kWh
$0.083
- Natural Gas $413k 88k
MMBtu
$5.55

4,574

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.3k
MMBtu
1.4%
- Electrical $18k 324k
kWh
2.4%
- Natural Gas $7.8k -
MMBtu
-
Waste $3.3k
Productivity/Other $23k
TOTAL $59k