ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary metal industries
3+ Characters Required for Products

1,354

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,259k 229k
MMBtu
$6.93
- Electrical $616k 13,390k
kWh
$0.083
- Natural Gas $411k 87k
MMBtu
$5.57

10,411

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $113k 9.3k
MMBtu
4.1%
- Electrical $51k 911k
kWh
6.8%
- Natural Gas $41k -
MMBtu
-
Waste $16k
Productivity/Other $72k
TOTAL $202k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,322

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,264k 231k
MMBtu
$6.84
- Electrical $617k 13,521k
kWh
$0.083
- Natural Gas $413k 87k
MMBtu
$5.50

4,524

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 3.3k
MMBtu
1.4%
- Electrical $18k 326k
kWh
2.4%
- Natural Gas $7.8k -
MMBtu
-
Waste $3.3k
Productivity/Other $24k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall