ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonclay refractories
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,432k 262k
MMBtu
$6.39
- Electrical $690k 13,622k
kWh
$0.057
- Natural Gas $629k 120k
MMBtu
$5.71

259

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $145k 6.2k
MMBtu
2.4%
- Electrical $34k 606k
kWh
4.4%
- Natural Gas $106k -
MMBtu
-
Waste $15k
Productivity/Other $64k
TOTAL $224k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,503k 276k
MMBtu
$6.13
- Electrical $728k 14,379k
kWh
$0.058
- Natural Gas $663k 127k
MMBtu
$5.73

108

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.5k
MMBtu
0.9%
- Electrical $12k 243k
kWh
1.7%
- Natural Gas $8.8k -
MMBtu
-
Waste $15k
Productivity/Other $38k
TOTAL $76k
*May be negative reflecting an increased cost component required to save energy and costs overall