ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mineral wool
3+ Characters Required for Products

33

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,464k 574k
MMBtu
$5.65
- Electrical $920k 24,356k
kWh
$0.046
- Natural Gas $967k 290k
MMBtu
$4.37

292

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $253k 33k
MMBtu
5.7%
- Electrical $142k 3,200k
kWh
13.1%
- Natural Gas $72k -
MMBtu
-
Waste $26k
Productivity/Other $56k
TOTAL $334k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,740k 646k
MMBtu
$5.17
- Electrical $1,009k 27,195k
kWh
$0.041
- Natural Gas $1,086k 328k
MMBtu
$3.77

141

Implemented Recommendations

4.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 10k
MMBtu
1.6%
- Electrical $40k 984k
kWh
3.6%
- Natural Gas $37k -
MMBtu
-
Waste $8.1k
Productivity/Other $35k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall