ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mineral wool
3+ Characters Required for Products

31

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,489k 588k
MMBtu
$5.54
- Electrical $901k 24,093k
kWh
$0.045
- Natural Gas $1,023k 304k
MMBtu
$4.38

274

Recommendations

8.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $247k 31k
MMBtu
5.3%
- Electrical $134k 3,021k
kWh
12.5%
- Natural Gas $77k -
MMBtu
-
Waste $28k
Productivity/Other $54k
TOTAL $328k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,693k 644k
MMBtu
$5.15
- Electrical $961k 26,164k
kWh
$0.041
- Natural Gas $1,119k 335k
MMBtu
$3.86

134

Implemented Recommendations

4.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 8.8k
MMBtu
1.4%
- Electrical $34k 854k
kWh
3.3%
- Natural Gas $38k -
MMBtu
-
Waste $8.4k
Productivity/Other $30k
TOTAL $129k
*May be negative reflecting an increased cost component required to save energy and costs overall