ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cut stone and stone products
3+ Characters Required for Products

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $672k 173k
MMBtu
$7.29
- Electrical $337k 6,513k
kWh
$0.057
- Natural Gas $41k 9.5k
MMBtu
$2.14

168

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 4.2k
MMBtu
2.4%
- Electrical $24k 411k
kWh
6.3%
- Natural Gas $0.0k -
MMBtu
-
Waste $2.3k
Productivity/Other $27k
TOTAL $88k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $672k 173k
MMBtu
$7.29
- Electrical $337k 6,513k
kWh
$0.057
- Natural Gas $41k 9.5k
MMBtu
$2.14

66

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 2.0k
MMBtu
1.2%
- Electrical $12k 197k
kWh
3.0%
- Natural Gas ($-0.1)k -
MMBtu
-
Waste $0.6k
Productivity/Other $5.2k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall