The ITAC Statistics page displays the average assessment results for the selected criteria.
29
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $661k | 171k |
MMBtu
|
$7.18 |
- Electrical | $327k | 6,332k |
kWh
|
$0.056 |
- Natural Gas | $48k | 12k |
MMBtu
|
$2.17 |
177
Recommendations
6.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $58k | 4.1k |
MMBtu
|
2.4% |
- Electrical | $23k | 401k |
kWh
|
6.3% |
- Natural Gas | $1.4k | - |
MMBtu
|
- |
Waste | $2.3k | |||
Productivity/Other | $26k | |||
TOTAL | $86k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
29
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $661k | 171k |
MMBtu
|
$7.18 |
- Electrical | $327k | 6,332k |
kWh
|
$0.056 |
- Natural Gas | $48k | 12k |
MMBtu
|
$2.17 |
72
Implemented Recommendations
2.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $14k | 2.0k |
MMBtu
|
1.2% |
- Electrical | $11k | 194k |
kWh
|
3.1% |
- Natural Gas | ($-0.1)k | - |
MMBtu
|
- |
Waste | $0.6k | |||
Productivity/Other | $5.1k | |||
TOTAL | $20k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |