ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cut stone and stone products
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $641k 165k
MMBtu
$7.38
- Electrical $318k 6,134k
kWh
$0.059
- Natural Gas $46k 11k
MMBtu
$2.09

183

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 4.1k
MMBtu
2.5%
- Electrical $24k 401k
kWh
6.5%
- Natural Gas $1.3k -
MMBtu
-
Waste $2.2k
Productivity/Other $26k
TOTAL $85k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $661k 171k
MMBtu
$7.18
- Electrical $327k 6,332k
kWh
$0.056
- Natural Gas $48k 12k
MMBtu
$2.17

72

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 2.0k
MMBtu
1.2%
- Electrical $11k 194k
kWh
3.1%
- Natural Gas ($-0.1)k -
MMBtu
-
Waste $0.6k
Productivity/Other $5.1k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall