ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete products, except block and brick
3+ Characters Required for Products

99

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $335k 49k
MMBtu
$8.29
- Electrical $147k 2,893k
kWh
$0.066
- Natural Gas $96k 16k
MMBtu
$5.01

736

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 3.3k
MMBtu
6.8%
- Electrical $22k 323k
kWh
11.2%
- Natural Gas $8.9k -
MMBtu
-
Waste $3.9k
Productivity/Other $41k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

98

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $318k 48k
MMBtu
$8.26
- Electrical $134k 2,739k
kWh
$0.066
- Natural Gas $97k 16k
MMBtu
$4.91

360

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 1.3k
MMBtu
2.7%
- Electrical $8.4k 124k
kWh
4.5%
- Natural Gas $6.7k -
MMBtu
-
Waste $1.3k
Productivity/Other $9.3k
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall