ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete block and brick
3+ Characters Required for Products

24

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $243k 25k
MMBtu
$9.62
- Electrical $93k 1,154k
kWh
$0.069
- Natural Gas $80k 12k
MMBtu
$10.56

144

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 1.8k
MMBtu
7.2%
- Electrical $11k 177k
kWh
15.4%
- Natural Gas $9.0k -
MMBtu
-
Waste $0.2k
Productivity/Other $36k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $248k 26k
MMBtu
$9.11
- Electrical $97k 1,194k
kWh
$0.070
- Natural Gas $82k 12k
MMBtu
$10.61

63

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $7.1k 0.4k
MMBtu
1.5%
- Electrical $3.4k 39k
kWh
3.2%
- Natural Gas $2.6k -
MMBtu
-
Waste $0.2k
Productivity/Other $2.2k
TOTAL $9.5k
*May be negative reflecting an increased cost component required to save energy and costs overall