ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Concrete, gypsum, and plaster products
3+ Characters Required for Products

225

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $944k 188k
MMBtu
$8.05
- Electrical $260k 4,843k
kWh
$0.068
- Natural Gas $557k 129k
MMBtu
$4.69

1,541

Recommendations

6.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 12k
MMBtu
6.5%
- Electrical $57k 1,187k
kWh
24.5%
- Natural Gas $22k -
MMBtu
-
Waste $2.8k
Productivity/Other $83k
TOTAL $182k
*May be negative reflecting an increased cost component required to save energy and costs overall

223

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $950k 190k
MMBtu
$8.02
- Electrical $261k 4,877k
kWh
$0.068
- Natural Gas $561k 130k
MMBtu
$4.72

725

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 3.3k
MMBtu
1.7%
- Electrical $18k 317k
kWh
6.5%
- Natural Gas $1.2k -
MMBtu
-
Waste $0.8k
Productivity/Other $11k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall