ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pottery and related products
3+ Characters Required for Products

52

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,152k 245k
MMBtu
$7.16
- Electrical $456k 8,347k
kWh
$0.068
- Natural Gas $572k 160k
MMBtu
$5.84

401

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $108k 6.9k
MMBtu
2.8%
- Electrical $42k 671k
kWh
8.0%
- Natural Gas $53k -
MMBtu
-
Waste $3.0k
Productivity/Other $13k
TOTAL $124k
*May be negative reflecting an increased cost component required to save energy and costs overall

51

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,164k 249k
MMBtu
$7.06
- Electrical $461k 8,455k
kWh
$0.068
- Natural Gas $581k 162k
MMBtu
$5.73

165

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.8k
MMBtu
1.1%
- Electrical $17k 273k
kWh
3.2%
- Natural Gas $6.4k -
MMBtu
-
Waste $0.5k
Productivity/Other $0.2k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall