ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Clay refractories
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,163k 332k
MMBtu
$4.49
- Electrical $374k 7,262k
kWh
$0.054
- Natural Gas $694k 257k
MMBtu
$3.75

131

Recommendations

8.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $149k 9.5k
MMBtu
2.8%
- Electrical $49k 923k
kWh
12.7%
- Natural Gas $88k -
MMBtu
-
Waste $16k
Productivity/Other $35k
TOTAL $201k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,163k 332k
MMBtu
$4.49
- Electrical $374k 7,262k
kWh
$0.054
- Natural Gas $694k 257k
MMBtu
$3.75

70

Implemented Recommendations

4.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 7.9k
MMBtu
2.4%
- Electrical $41k 773k
kWh
10.6%
- Natural Gas $9.2k -
MMBtu
-
Waste $3.1k
Productivity/Other $31k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall