ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Ceramic wall and floor tile
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,003k 402k
MMBtu
$5.65
- Electrical $737k 14,696k
kWh
$0.054
- Natural Gas $878k 252k
MMBtu
$4.02

138

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $166k 11k
MMBtu
2.6%
- Electrical $59k 1,039k
kWh
7.1%
- Natural Gas $21k -
MMBtu
-
Waste $3.3k
Productivity/Other $217k
TOTAL $386k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,883k 388k
MMBtu
$5.63
- Electrical $660k 14,187k
kWh
$0.052
- Natural Gas $832k 243k
MMBtu
$4.04

49

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $36k 5.3k
MMBtu
1.4%
- Electrical $25k 515k
kWh
3.6%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other $0.8k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall