ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3251 Brick and structural clay tile

43

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,114k 262k
MMBtu
$5.14
- Electrical $280k 5,178k
kWh
$0.054
- Natural Gas $697k 169k
MMBtu
$3.95

276

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $101k 5.6k
MMBtu
2.1%
- Electrical $44k 548k
kWh
10.6%
- Natural Gas $45k -
MMBtu
-
Waste $1.3k
Productivity/Other $16k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

42

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,112k 261k
MMBtu
$5.18
- Electrical $282k 5,224k
kWh
$0.054
- Natural Gas $694k 166k
MMBtu
$3.97

129

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.5k
MMBtu
1.7%
- Electrical $37k 442k
kWh
8.5%
- Natural Gas ($-1.3)k -
MMBtu
-
Waste -
Productivity/Other $9.5k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall