ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Structural clay products
3+ Characters Required for Products

86

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,276k 297k
MMBtu
$5.41
- Electrical $395k 7,770k
kWh
$0.057
- Natural Gas $702k 197k
MMBtu
$3.82

611

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $118k 7.0k
MMBtu
2.4%
- Electrical $45k 683k
kWh
8.8%
- Natural Gas $45k -
MMBtu
-
Waste $5.4k
Productivity/Other $65k
TOTAL $188k
*May be negative reflecting an increased cost component required to save energy and costs overall

83

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,234k 291k
MMBtu
$5.43
- Electrical $373k 7,554k
kWh
$0.056
- Natural Gas $687k 193k
MMBtu
$3.83

278

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 4.9k
MMBtu
1.7%
- Electrical $32k 478k
kWh
6.3%
- Natural Gas $2.0k -
MMBtu
-
Waste $1.3k
Productivity/Other $13k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall