ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Glass containers
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,661k 1,121k
MMBtu
$4.80
- Electrical $1,858k 42,889k
kWh
$0.042
- Natural Gas $2,624k 682k
MMBtu
$4.21

113

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $488k 62k
MMBtu
5.5%
- Electrical $258k 6,015k
kWh
14.0%
- Natural Gas $195k -
MMBtu
-
Waste $3.1k
Productivity/Other $4.7k
TOTAL $496k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,661k 1,121k
MMBtu
$4.80
- Electrical $1,858k 42,889k
kWh
$0.042
- Natural Gas $2,624k 682k
MMBtu
$4.21

44

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 12k
MMBtu
1.0%
- Electrical $46k 1,131k
kWh
2.6%
- Natural Gas $7.0k -
MMBtu
-
Waste -
Productivity/Other $0.8k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall