ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Glass containers
3+ Characters Required for Products

20

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,683k 1,078k
MMBtu
$5.16
- Electrical $1,947k 41,856k
kWh
$0.045
- Natural Gas $2,544k 649k
MMBtu
$4.41

123

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $615k 78k
MMBtu
7.2%
- Electrical $429k 7,592k
kWh
18.1%
- Natural Gas $152k -
MMBtu
-
Waste $2.8k
Productivity/Other $8.0k
TOTAL $626k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,483k 1,069k
MMBtu
$5.08
- Electrical $1,792k 41,257k
kWh
$0.043
- Natural Gas $2,489k 646k
MMBtu
$4.38

44

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 11k
MMBtu
1.0%
- Electrical $43k 1,071k
kWh
2.6%
- Natural Gas $6.6k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall