ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,184k 716k
MMBtu
$10.07
- Electrical $1,052k 25,982k
kWh
$0.054
- Natural Gas $1,845k 450k
MMBtu
$5.20

242

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $224k 22k
MMBtu
3.1%
- Electrical $116k 2,182k
kWh
8.4%
- Natural Gas $27k -
MMBtu
-
Waste $4.3k
Productivity/Other $462k
TOTAL $690k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,268k 737k
MMBtu
$9.31
- Electrical $1,080k 26,736k
kWh
$0.052
- Natural Gas $1,901k 463k
MMBtu
$4.66

104

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 5.7k
MMBtu
0.8%
- Electrical $25k 551k
kWh
2.1%
- Natural Gas $25k -
MMBtu
-
Waste $1.5k
Productivity/Other $2.9k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall