ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products

38

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,784k 758k
MMBtu
$11.17
- Electrical $1,196k 26,380k
kWh
$0.061
- Natural Gas $2,261k 488k
MMBtu
$6.10

270

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $233k 22k
MMBtu
2.9%
- Electrical $118k 2,151k
kWh
8.2%
- Natural Gas $24k -
MMBtu
-
Waste $7.2k
Productivity/Other $413k
TOTAL $653k
*May be negative reflecting an increased cost component required to save energy and costs overall

34

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,186k 716k
MMBtu
$10.03
- Electrical $1,052k 25,982k
kWh
$0.054
- Natural Gas $1,845k 450k
MMBtu
$5.20

112

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 5.5k
MMBtu
0.8%
- Electrical $24k 535k
kWh
2.1%
- Natural Gas $24k -
MMBtu
-
Waste $1.5k
Productivity/Other $7.7k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall