ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products

39

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,583k 734k
MMBtu
$10.14
- Electrical $1,081k 25,102k
kWh
$0.057
- Natural Gas $2,206k 476k
MMBtu
$5.69

277

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $213k 22k
MMBtu
3.0%
- Electrical $116k 2,129k
kWh
8.5%
- Natural Gas $23k -
MMBtu
-
Waste $4.0k
Productivity/Other $403k
TOTAL $620k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,017k 680k
MMBtu
$8.95
- Electrical $1,001k 24,756k
kWh
$0.052
- Natural Gas $1,746k 426k
MMBtu
$4.65

118

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.2k
MMBtu
0.8%
- Electrical $23k 508k
kWh
2.1%
- Natural Gas $23k -
MMBtu
-
Waste $1.6k
Productivity/Other $2.8k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall