ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,947k 661k
MMBtu
$9.65
- Electrical $978k 24,117k
kWh
$0.054
- Natural Gas $1,699k 414k
MMBtu
$5.14

265

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $210k 21k
MMBtu
3.2%
- Electrical $109k 2,044k
kWh
8.5%
- Natural Gas $24k -
MMBtu
-
Waste $4.3k
Productivity/Other $425k
TOTAL $639k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,017k 680k
MMBtu
$8.95
- Electrical $1,001k 24,756k
kWh
$0.052
- Natural Gas $1,746k 426k
MMBtu
$4.65

118

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.2k
MMBtu
0.8%
- Electrical $23k 508k
kWh
2.1%
- Natural Gas $23k -
MMBtu
-
Waste $1.6k
Productivity/Other $2.8k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall