ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Flat glass
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,526k 706k
MMBtu
$10.72
- Electrical $1,119k 24,668k
kWh
$0.060
- Natural Gas $2,098k 453k
MMBtu
$5.98

293

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $219k 21k
MMBtu
2.9%
- Electrical $111k 2,029k
kWh
8.2%
- Natural Gas $21k -
MMBtu
-
Waste $7.0k
Productivity/Other $383k
TOTAL $610k
*May be negative reflecting an increased cost component required to save energy and costs overall

37

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,949k 662k
MMBtu
$9.62
- Electrical $978k 24,117k
kWh
$0.054
- Natural Gas $1,699k 414k
MMBtu
$5.14

126

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 5.1k
MMBtu
0.8%
- Electrical $22k 493k
kWh
2.0%
- Natural Gas $23k -
MMBtu
-
Waste $1.6k
Productivity/Other $7.2k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall