The ITAC Statistics page displays the average assessment results for the selected criteria.
6
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $428k | 74k |
MMBtu
|
$10.29 |
- Electrical | $156k | 3,149k |
kWh
|
$0.067 |
- Natural Gas | $169k | 41k |
MMBtu
|
$1.59 |
35
Recommendations
5.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $67k | 4.1k |
MMBtu
|
5.6% |
- Electrical | $18k | 401k |
kWh
|
12.7% |
- Natural Gas | $36k | - |
MMBtu
|
- |
Waste | $0.4k | |||
Productivity/Other | $209k | |||
TOTAL | $276k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
5
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $488k | 87k |
MMBtu
|
$9.69 |
- Electrical | $179k | 3,639k |
kWh
|
$0.069 |
- Natural Gas | $202k | 49k |
MMBtu
|
$1.90 |
17
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $35k | 3.5k |
MMBtu
|
4.1% |
- Electrical | $14k | 344k |
kWh
|
9.5% |
- Natural Gas | $17k | - |
MMBtu
|
- |
Waste | $0.1k | |||
Productivity/Other | $7.2k | |||
TOTAL | $42k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |