ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Luggage
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $134k 17k
MMBtu
$8.01
- Electrical $81k 1,018k
kWh
$0.081
- Natural Gas $41k 6.9k
MMBtu
$6.26

31

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.0k
MMBtu
11.5%
- Electrical $16k 195k
kWh
19.2%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other $36k
TOTAL $70k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $134k 17k
MMBtu
$8.01
- Electrical $81k 1,018k
kWh
$0.081
- Natural Gas $41k 6.9k
MMBtu
$6.26

12

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.3k 0.7k
MMBtu
4.3%
- Electrical $8.1k 73k
kWh
7.1%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other $32k
TOTAL $41k