ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Replace electric motors with back pressure steam turbines and use exhaust steam for process heat
NAICS 3+ Digits Required
SIC Leather gloves and mittens
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $174k 40k
MMBtu
$5.39
- Electrical $70k 2,148k
kWh
$0.042
- Natural Gas $60k 18k
MMBtu
$5.70

21

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.4k
MMBtu
3.4%
- Electrical $5.6k 133k
kWh
6.2%
- Natural Gas $5.1k -
MMBtu
-
Waste $28k
Productivity/Other ($-0.5)k
TOTAL $42k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $174k 40k
MMBtu
$5.39
- Electrical $70k 2,148k
kWh
$0.042
- Natural Gas $60k 18k
MMBtu
$5.70

13

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $11k 1.1k
MMBtu
2.7%
- Electrical $3.5k 105k
kWh
4.9%
- Natural Gas $5.3k -
MMBtu
-
Waste $19k
Productivity/Other $0.3k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall