ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Men's footwear, except athletic
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $176k 24k
MMBtu
$8.29
- Electrical $121k 2,058k
kWh
$0.070
- Natural Gas $3.2k 0.6k
MMBtu
$1.84

126

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.7k
MMBtu
7.1%
- Electrical $10k 168k
kWh
8.1%
- Natural Gas ($-1.6)k -
MMBtu
-
Waste $5.5k
Productivity/Other $73k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $173k 24k
MMBtu
$8.15
- Electrical $120k 2,077k
kWh
$0.070
- Natural Gas $3.3k 0.6k
MMBtu
$1.94

69

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.0k 1.0k
MMBtu
4.2%
- Electrical $6.1k 100k
kWh
4.8%
- Natural Gas ($-1.5)k -
MMBtu
-
Waste $0.7k
Productivity/Other $56k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall