ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC House slippers
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $41k 4.9k
MMBtu
$8.38
- Electrical $29k 381k
kWh
$0.076
- Natural Gas $3.8k 0.7k
MMBtu
$2.87

29

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $5.3k 0.4k
MMBtu
8.6%
- Electrical $3.1k 41k
kWh
10.8%
- Natural Gas $0.9k -
MMBtu
-
Waste $1.3k
Productivity/Other $2.9k
TOTAL $9.5k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $41k 4.9k
MMBtu
$8.38
- Electrical $29k 381k
kWh
$0.076
- Natural Gas $3.8k 0.7k
MMBtu
$2.87

7

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $0.9k 0.1k
MMBtu
2.1%
- Electrical $0.8k 10k
kWh
2.7%
- Natural Gas $0.1k -
MMBtu
-
Waste $0.9k
Productivity/Other $0.3k
TOTAL $2.1k