ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust
NAICS 3+ Digits Required
SIC Footwear, except rubber
3+ Characters Required for Products

46

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $165k 23k
MMBtu
$8.04
- Electrical $106k 1,822k
kWh
$0.068
- Natural Gas $7.0k 1.4k
MMBtu
$2.89

327

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $14k 1.6k
MMBtu
7.3%
- Electrical $9.3k 161k
kWh
8.8%
- Natural Gas ($-0.1)k -
MMBtu
-
Waste $8.9k
Productivity/Other $35k
TOTAL $58k
*May be negative reflecting an increased cost component required to save energy and costs overall

45

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $164k 23k
MMBtu
$7.98
- Electrical $106k 1,824k
kWh
$0.068
- Natural Gas $7.1k 1.4k
MMBtu
$2.95

182

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.1k 1.2k
MMBtu
5.2%
- Electrical $6.3k 114k
kWh
6.2%
- Natural Gas ($-0.2)k -
MMBtu
-
Waste $3.9k
Productivity/Other $23k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall