The ITAC Statistics page displays the average assessment results for the selected criteria.
4
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $234k | 36k |
MMBtu
|
$6.50 |
- Electrical | $187k | 2,849k |
kWh
|
$0.073 |
- Natural Gas | $12k | 1.7k |
MMBtu
|
$1.73 |
27
Recommendations
6.8
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $17k | 1.6k |
MMBtu
|
4.4% |
- Electrical | $10k | 157k |
kWh
|
5.5% |
- Natural Gas | $2.8k | - |
MMBtu
|
- |
Waste | $4.6k | |||
Productivity/Other | ($-0.4)k | |||
TOTAL | $21k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
4
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $234k | 36k |
MMBtu
|
$6.50 |
- Electrical | $187k | 2,849k |
kWh
|
$0.073 |
- Natural Gas | $12k | 1.7k |
MMBtu
|
$1.73 |
14
Implemented Recommendations
3.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $8.8k | 0.5k |
MMBtu
|
1.4% |
- Electrical | $3.1k | 49k |
kWh
|
1.7% |
- Natural Gas | $2.3k | - |
MMBtu
|
- |
Waste | $4.6k | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $13k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |