The ITAC Statistics page displays the average assessment results for the selected criteria.
90
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $279k | 48k |
MMBtu
|
$7.39 |
- Electrical | $146k | 2,525k |
kWh
|
$0.067 |
- Natural Gas | $61k | 14k |
MMBtu
|
$3.18 |
636
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $25k | 1.9k |
MMBtu
|
4.0% |
- Electrical | $11k | 185k |
kWh
|
7.3% |
- Natural Gas | $8.9k | - |
MMBtu
|
- |
Waste | $9.1k | |||
Productivity/Other | $37k | |||
TOTAL | $72k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
88
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $281k | 49k |
MMBtu
|
$7.29 |
- Electrical | $147k | 2,555k |
kWh
|
$0.067 |
- Natural Gas | $62k | 14k |
MMBtu
|
$3.25 |
323
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $14k | 1.2k |
MMBtu
|
2.4% |
- Electrical | $6.6k | 112k |
kWh
|
4.4% |
- Natural Gas | $4.4k | - |
MMBtu
|
- |
Waste | $4.6k | |||
Productivity/Other | $15k | |||
TOTAL | $33k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |