The ITAC Statistics page displays the average assessment results for the selected criteria.
SIC 3088 Plastics plumbing fixtures

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $377k 48k
MMBtu
$8.37
- Electrical $191k 3,274k
kWh
$0.062
- Natural Gas $95k 13k
MMBtu
$6.80

243

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 2.7k
MMBtu
5.6%
- Electrical $16k 264k
kWh
8.1%
- Natural Gas $17k -
MMBtu
-
Waste $12k
Productivity/Other $44k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $342k 47k
MMBtu
$7.98
- Electrical $193k 3,314k
kWh
$0.062
- Natural Gas $98k 13k
MMBtu
$7.00

132

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 1.3k
MMBtu
2.7%
- Electrical $8.4k 124k
kWh
3.7%
- Natural Gas $5.2k -
MMBtu
-
Waste $4.1k
Productivity/Other $23k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall