ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics foam products
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $783k 172k
MMBtu
$5.08
- Electrical $368k 7,763k
kWh
$0.054
- Natural Gas $280k 92k
MMBtu
$3.48

35

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 2.7k
MMBtu
1.6%
- Electrical $13k 267k
kWh
3.4%
- Natural Gas $15k -
MMBtu
-
Waste $0.3k
Productivity/Other $56k
TOTAL $94k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $783k 172k
MMBtu
$5.08
- Electrical $368k 7,763k
kWh
$0.054
- Natural Gas $280k 92k
MMBtu
$3.48

18

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.7k
MMBtu
1.0%
- Electrical $7.4k 165k
kWh
2.1%
- Natural Gas $9.3k -
MMBtu
-
Waste $0.3k
Productivity/Other $15k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall