ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plastics pipe
3+ Characters Required for Products

87

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $659k 115k
MMBtu
$6.44
- Electrical $502k 10,482k
kWh
$0.060
- Natural Gas $29k 6.9k
MMBtu
$3.80

703

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 10k
MMBtu
8.9%
- Electrical $57k 994k
kWh
9.5%
- Natural Gas $4.8k -
MMBtu
-
Waste $6.9k
Productivity/Other $42k
TOTAL $121k
*May be negative reflecting an increased cost component required to save energy and costs overall

84

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $662k 117k
MMBtu
$6.24
- Electrical $506k 10,697k
kWh
$0.058
- Natural Gas $27k 6.7k
MMBtu
$3.70

338

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 4.3k
MMBtu
3.7%
- Electrical $21k 417k
kWh
3.9%
- Natural Gas $1.5k -
MMBtu
-
Waste $1.0k
Productivity/Other $17k
TOTAL $46k