ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Laminated plastics plate, sheet, and profile shapes
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $108k 9.9k
MMBtu
$10.94
- Electrical $80k 752k
kWh
$0.096
- Natural Gas $8.7k 2.2k
MMBtu
$1.99

24

Recommendations

12.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 0.7k
MMBtu
6.6%
- Electrical $5.6k 63k
kWh
8.4%
- Natural Gas $5.2k -
MMBtu
-
Waste -
Productivity/Other $79k
TOTAL $92k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $108k 9.9k
MMBtu
$10.94
- Electrical $80k 752k
kWh
$0.096
- Natural Gas $8.7k 2.2k
MMBtu
$1.99

12

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $4.7k 0.4k
MMBtu
3.8%
- Electrical $2.2k 36k
kWh
4.8%
- Natural Gas $0.9k -
MMBtu
-
Waste -
Productivity/Other $70k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall