ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Unsupported plastics profile shapes
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $500k 115k
MMBtu
$6.88
- Electrical $410k 10,901k
kWh
$0.059
- Natural Gas $17k 3.1k
MMBtu
$4.21

221

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $56k 8.3k
MMBtu
7.2%
- Electrical $46k 805k
kWh
7.4%
- Natural Gas $0.3k -
MMBtu
-
Waste $4.0k
Productivity/Other $2.7k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall

29

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $500k 115k
MMBtu
$6.88
- Electrical $410k 10,901k
kWh
$0.059
- Natural Gas $17k 3.1k
MMBtu
$4.21

122

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $24k 3.8k
MMBtu
3.3%
- Electrical $22k 374k
kWh
3.4%
- Natural Gas $0.5k -
MMBtu
-
Waste -
Productivity/Other $1.2k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall