ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere
3+ Characters Required for Products

261

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 113k
MMBtu
$7.49
- Electrical $343k 6,271k
kWh
$0.065
- Natural Gas $138k 29k
MMBtu
$5.65

2,163

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 6.4k
MMBtu
5.7%
- Electrical $41k 626k
kWh
10.0%
- Natural Gas $19k -
MMBtu
-
Waste $7.9k
Productivity/Other $26k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

244

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $596k 116k
MMBtu
$7.17
- Electrical $339k 6,301k
kWh
$0.064
- Natural Gas $144k 31k
MMBtu
$5.45

998

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 2.7k
MMBtu
2.3%
- Electrical $16k 258k
kWh
4.1%
- Natural Gas $6.9k -
MMBtu
-
Waste $3.7k
Productivity/Other $14k
TOTAL $45k
*May be negative reflecting an increased cost component required to save energy and costs overall