ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gaskets, packing, and sealing devices
3+ Characters Required for Products

97

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $461k 64k
MMBtu
$7.85
- Electrical $284k 4,939k
kWh
$0.064
- Natural Gas $72k 12k
MMBtu
$5.06

737

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 7.8k
MMBtu
12.1%
- Electrical $45k 758k
kWh
15.3%
- Natural Gas ($-6.4)k -
MMBtu
-
Waste $13k
Productivity/Other $46k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

93

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $455k 65k
MMBtu
$7.47
- Electrical $280k 4,980k
kWh
$0.063
- Natural Gas $74k 12k
MMBtu
$5.02

345

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 2.0k
MMBtu
3.1%
- Electrical $11k 194k
kWh
3.9%
- Natural Gas $6.0k -
MMBtu
-
Waste $0.9k
Productivity/Other $16k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall