ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and plastics hose and belting
3+ Characters Required for Products

53

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $796k 146k
MMBtu
$6.55
- Electrical $406k 9,245k
kWh
$0.061
- Natural Gas $223k 49k
MMBtu
$5.25

447

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 5.0k
MMBtu
3.5%
- Electrical $26k 492k
kWh
5.3%
- Natural Gas $20k -
MMBtu
-
Waste $5.5k
Productivity/Other $18k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall

52

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $804k 148k
MMBtu
$6.45
- Electrical $409k 9,367k
kWh
$0.061
- Natural Gas $228k 50k
MMBtu
$5.10

198

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.3k
MMBtu
1.6%
- Electrical $12k 229k
kWh
2.4%
- Natural Gas $8.6k -
MMBtu
-
Waste $3.5k
Productivity/Other $9.5k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall