ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and plastics footwear
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $223k 44k
MMBtu
$5.29
- Electrical $130k 2,783k
kWh
$0.055
- Natural Gas $65k 15k
MMBtu
$3.29

40

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $19k 2.9k
MMBtu
6.6%
- Electrical $18k 286k
kWh
10.3%
- Natural Gas ($-0.7)k -
MMBtu
-
Waste $0.6k
Productivity/Other $46k
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $223k 44k
MMBtu
$5.29
- Electrical $130k 2,783k
kWh
$0.055
- Natural Gas $65k 15k
MMBtu
$3.29

10

Implemented Recommendations

1.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2.9k 0.6k
MMBtu
1.3%
- Electrical $2.6k 56k
kWh
2.0%
- Natural Gas -
-
MMBtu
-
Waste $0.3k
Productivity/Other $3.4k
TOTAL $6.6k
*May be negative reflecting an increased cost component required to save energy and costs overall